Electronic System

We have executed 4 projects for this client between 2012 and 2013 for the new Atma Plant in Campana. Among the most important we could highlight the following:

  • 2012/2013 Electricity for 22 injection molding machines
  • 2012/2013 TGBT Low voltage electric board
  • 2013 Power supply to 6 production lines
  • 2013 Motive power control panel and power supply to auxiliary equipment